# Short-Term Predictability of Photovoltaic Production over Italy

Preprint · Matteo De Felice, Marcello Petitta, Paolo M. Ruti

- Archive id: arxiv:1409.8202
- Published: 2014-09-29
- arXiv: https://arxiv.org/abs/1409.8202
- Source URL: https://arxiv.org/abs/1409.8202
- PDF: https://arxiv.org/pdf/1409.8202
- Provenance: arxiv

## Abstract

Photovoltaic (PV) power production increased drastically in Europe throughout the last years. About the 6% of electricity in Italy comes from PV and for an efficient management of the power grid an accurate and reliable forecasting of production would be needed. Starting from a dataset of electricity production of 65 Italian solar plants for the years 2011-2012 we investigate the possibility to forecast daily production from one to ten days of lead time without using on site measurements. Our study is divided in two parts: an assessment of the predictability of meteorological variables using weather forecasts and an analysis on the application of data-driven modelling in predicting solar power production. We calibrate a SVM model using available observations and then we force the same model with the predicted variables from weather forecasts with a lead time from one to ten days. As expected, solar power production is strongly influenced by cloudiness and clear sky, in fact we observe that while during summer we obtain a general error under the 10% (slightly lower in south Italy), during winter the error is abundantly above the 20%.

_Abstract reproduced under CC0-1.0 (arXiv descriptive metadata)._

---
Space Kitty Archive · https://space-kitty.com · API: https://space-kitty.com/api/v1 · MCP: https://space-kitty.com/mcp · Premium: $0.20/request via x402 (Base Sepolia (testnet)). Metadata: arXiv (CC0), OpenAlex (CC0), Europe PMC (CC BY/CC0 works), ClinicalTrials.gov.
