A Combination of Flow Shop Scheduling and the Shortest Path Problem

Kameng Nip, Zhenbo Wang, Fabrice Talla Nobibon, Roel Leus

Preprint: not peer reviewed. Results may change in later versions.

Abstract

This paper studies a combinatorial optimization problem which is obtained by combining the flow shop scheduling problem and the shortest path problem. The objective of the obtained problem is to select a subset of jobs that constitutes a feasible solution to the shortest path problem, and to execute the selected jobs on the flow shop machines to minimize the makespan. We argue that this problem is NP-hard even if the number of machines is two, and is NP-hard in the strong sense for the general case. We propose an intuitive approximation algorithm for the case where the number of machines is an input, and an improved approximation algorithm for fixed number of machines.

Abstract: arXiv descriptive metadata (CC0). Thank you to arXiv for use of its open access interoperability. This service was not reviewed or approved by, nor does it necessarily express or reflect the policies or opinions of, arXiv.

Record

Archive ID
arxiv:1309.0081
Published
Aug 31, 2013
arXiv
1309.0081
Categories
cs.DS
Provenance
arxiv