Preprint: not peer reviewed. Results may change in later versions.
Abstract
China Spallation Neutron Source(CSNS) target power will upgrade to 500 kW(CSNS-II) from 300kW, energy gain of H-Linac will up to 300 MeV from 80 MeV using about 50 superconductor cavities. LLRF is an important device for controlling the amplitude and phase of the SRF cavity field to be less than 0.6% and 0.6 deg. The parameters and requirements for CSNS-II Linac LLRF are presented here. The preliminary design work and algorithm verification progress and results at C-ADS Injector-I are introduced.
Abstract: arXiv descriptive metadata (CC0). Thank you to arXiv for use of its open access interoperability. This service was not reviewed or approved by, nor does it necessarily express or reflect the policies or opinions of, arXiv.
Record
- Archive ID
- arxiv:2311.09417
- Published
- Nov 16, 2023
- arXiv
- 2311.09417
- Categories
- physics.acc-ph
- Provenance
- arxiv