Quench Performance of the First Pre-series AUP Cryo-assembly

M. Baldini, G. Chlachidze, G. Apollinari, J. Dimarco, S. Feher, V. Nikolic, D. Orris, R. Rabehl, S. Stoynev, T. Strauss, M. Tartaglia, A. Vouris

Preprint: not peer reviewed. Results may change in later versions.

Abstract

The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-LHC Accelerator Upgrade Project (AUP) as part of the U.S. contributions to the HL-LHC. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 and Q3 inner triplet optical elements in front of the two interaction points. Each cryo-assembly consists of two 4.2 m long Nb3Sn quadrupole magnets with aperture 150 mm and operating gradient 132.6 T/m. The first pre-series cryo-assembly has been fabricated and successfully tested at the horizontal test facility at Fermi National Accelerator Laboratory. In this manuscript we report the quench test results of the LQXFA/B-01 cryo-assembly. The primary objective of the horizontal test is full cryo-assembly qualification and validation of the performance requirements.

Abstract: arXiv descriptive metadata (CC0). Thank you to arXiv for use of its open access interoperability. This service was not reviewed or approved by, nor does it necessarily express or reflect the policies or opinions of, arXiv.

Record

Archive ID
arxiv:2403.00171
Published
Feb 29, 2024
DOI
10.1109/tasc.2024.3358777
arXiv
2403.00171
Categories
physics.acc-ph
Provenance
arxiv