Cost Projections for High Temperature Superconductors

Paul M. Grant, Thomas P. Sheahen

Preprint: not peer reviewed. Results may change in later versions.

Abstract

It is generally argued that for high-temperature superconductors (HTS) to be cost-competitive in power applications, the wire will have to sell for about $10 per kiloampere meter ($10/kAm) for operation at 77 K (e.g., NbTi costs around $1/kAm and Nb3Sn around $8, each at 4.2 K). Given what is already known about the critical current performance of Pb-stabilized Bi-2223 (BSCCO), this cost target may be extremely difficult to realistically achieve for silver-sheathed BSCCO produced by the oxide-powder-in-tube (OPIT) technique. In this paper, we examine the cost of component materials, add reasonable estimates for labor and related costs, and arrive at a likely cost/performance (C/P) figure. We also estimate the capital cost of a factory to produce HTS conductor by a particular coated conductor method, and calculate the necessary production-output and performance parameters necessary to manufacture 10 km/yr of wire and its associated C/P. Our results indicate that the real C/P seen by the customer will remain substantially above this $10/kAm target for some time to come.

Abstract: arXiv descriptive metadata (CC0). Thank you to arXiv for use of its open access interoperability. This service was not reviewed or approved by, nor does it necessarily express or reflect the policies or opinions of, arXiv.

Record

Archive ID
arxiv:cond-mat/0202386
Published
Feb 21, 2002
arXiv
cond-mat/0202386
Categories
cond-mat.supr-con, cond-mat.mtrl-sci
Provenance
arxiv